Builder Lookup · Fairfax, Loudoun and Arlington permit record
Northwood Construction Inc
This name appears on county permits but was not matched to a DPOR license record. It may be a trade name, a lapsed license, or a spelling variant.
License not matched to DPOR roster; the name above is as written on county permits.
Sterling
Fairfax County
Northwood Construction Inc has 22 jobs on Fairfax County permit records issued September 1, 2022 to September 12, 2026 (23 permits), mostly kitchen and bath work. Retrieved September 12, 2026.
Jobs by year
Peer groups
In Kitchen and bath: 11 jobs.
About typical for this group, based on 11 closed permits in this group. County review cycles, owner decisions and final-inspection scheduling are all inside this number.
Completion above the group median, based on 11 permits in this group. County review cycles, owner decisions and final-inspection scheduling are all inside this number.
In Additions and second stories: 8 jobs.
Not enough record to compare. 8 jobs since September 1, 2022.
In Basement finishes: Not enough record to compare. 3 jobs since September 1, 2022.
Works for
Worked for individual homeowners on 86% of jobs; the rest were company-owned properties (builders, investors, LLCs).
Crew
| Trade partner | Trade | Shared sites |
|---|---|---|
| Alan S Halbach | Electrical | 21 |
| Argent Heating & Cooling LLC | Mechanical (HVAC) | 6 |
| F J Hooks Plumbing Inc | Plumbing | 6 |
| Innovation Mechanical Inc | Mechanical (HVAC) | 3 |
Where they work
Jobs by zip code
Fewer than 3 jobs in any one zip code.
Zip codes and map cells with fewer than 3 jobs are not shown.
Fewer than 3 jobs in any one map cell, so no map is shown.
Loudoun County
Northwood Construction Inc has 5 jobs on Loudoun County permit records issued July 1, 2023 to August 31, 2026 (8 permits), mostly kitchen and bath work. Retrieved September 11, 2026.
Jobs by year
Peer groups
In Kitchen and bath: 4 jobs, median declared value $65,000 (group median $9,000).
Not enough record to compare. 4 jobs since July 1, 2023.
In Additions and second stories: Not enough record to compare. 1 job since July 1, 2023.
In Basement finishes: Not enough record to compare. 1 job since July 1, 2023.
Loudoun County's reports carry no closing dates, so no timing or completion labels are shown for Loudoun County.
Crew
No electrical, plumbing or mechanical firm shares 3 or more permitted sites with this firm on record.
Where they work
Jobs by zip code
Fewer than 3 jobs in any one zip code.
Zip codes and map cells with fewer than 3 jobs are not shown.
Fewer than 3 jobs in any one map cell, so no map is shown.
Arlington County
Northwood Construction Inc has 3 jobs on Arlington County permit records issued September 1, 2022 to September 10, 2026 (6 permits), mostly basement finishes. Retrieved September 11, 2026.
Jobs by year
Peer groups
In Kitchen and bath: Not enough record to compare. 2 jobs since September 1, 2022.
In Basement finishes: Not enough record to compare. 2 jobs since September 1, 2022.
Works for
Worked for individual homeowners on 67% of jobs; the rest were company-owned properties (builders, investors, LLCs).
Crew
| Trade partner | Trade | Shared sites |
|---|---|---|
| Alan S Halbach | Electrical | 3 |
| F J Hooks Plumbing Inc | Plumbing | 3 |
Where they work
Jobs by zip code
Fewer than 3 jobs in any one zip code.
Zip codes and map cells with fewer than 3 jobs are not shown.
Fewer than 3 jobs in any one map cell, so no map is shown.
Sources and notes
- Arlington County permit records (open data API), retrieved September 11, 2026
- Arlington County permit portal, retrieved September 11, 2026
- Loudoun County issued building permit reports (monthly), retrieved September 11, 2026
- Fairfax County PLUS permit portal, "Building Records Issued" report, retrieved September 12, 2026
- Virginia DPOR regulant lists (contractor and tradesman licenses), retrieved September 11, 2026
- Fairfax County: permits issued September 1, 2022 to September 12, 2026. First permit in window January 27, 2023; most recent August 17, 2026. 23 permits, 22 jobs.
- Loudoun County: permits issued July 1, 2023 to August 31, 2026. First permit in window March 13, 2024; most recent August 11, 2026. 8 permits, 5 jobs.
- Arlington County: permits issued September 1, 2022 to September 10, 2026. First permit in window September 1, 2022; most recent December 2, 2024. 6 permits, 3 jobs.
- Jobs are distinct permitted sites; a site with several permits counts once.
Permit records show what was permitted, when, and by whom. They do not show workmanship, price fairness, or unpermitted work. Declared values are entered by applicants and are commonly understated. Completion figures reflect the county's closing process and are shown only relative to peers in the same window. Fairfax County, Loudoun County and Arlington County disclaim the accuracy of their data; so does this site.
Is something here wrong or missing? Tell us and we will correct it within one business day. Reply or report an error by email to contact@builderlookup.com.
Name as written on county permits:NORTHWOOD CONSTRUCTION INC; NORTHWOOD CONSTRUCTION, INC.
Work by category (jobs): kitchen and bath work 17; additions 9; basement finishes 6; work outside the site’s categories 2; fences, sheds, garages and driveways 1; roofing, siding, windows and doors 1.